XDR Results For Whole Rock Analysis (IN WEIGHT PERCENT) | ||||||||
---|---|---|---|---|---|---|---|---|
SAMPLE DEPTH | COMPOSITION (wt%) | TOTAL [wt%] | ||||||
ILLITE | KAOLINITE | CHLORITE | PLAGIOCLASE | QUARTZ | SIDERITE | PYRITE | ||
9029'01" | 0.50 | 16.17 | 2.17 | 16.46 | 57.55 | 7.15 | - | 100 |
9031'02" | 0.42 | 21.26 | 1.70 | 20.25 | 48.53 | 3.28 | 4.56 | 100 |
SCSR-02Chemical squeeze in the formation for permeability enhancement Through coiled tubing operation
The last data for well S-7 which showed the injection rate reach to 400 BWPD with 1970 psi compare with 250 BWPD before the job with the same WHP. Based on Norpetco official reports. The job proved that SCS chemical is not damaging fluid like the normal acid used before on other well and get 60% increase on the injection rate
The injection rate progress after chemical treatment job
Case | WHP(PSI) | Injection Rate(Bbl./Day) |
---|---|---|
Week 1 | 1700 | 305 |
Week 2 | 1900 | 350 |
Week 3 | 1900 | 400 |
Week 4 | 1900 | 432 |
Week 5 | 1900 | 503 |